Logo
  • Home
  • Our company
    • About us
    • Investment Strategy
    • Wind Energy
    • Social And Economic Development Goals
    • Social Infrastructure Overview
  • Projects
  • Contact
  • News
Contact us
Logo
Menu
  • Home
  • Our company
    • About us
    • Investment Strategy
    • Wind Energy
    • Social And Economic Development Goals
    • Social Infrastructure Overview
  • Projects
  • Contact
  • News
Feedback
  • Home
  • Projects
  • Wind
  • ZALESIE - Successfully developed and built
Back
ZALESIE - Successfully developed and built
ZALESIE - Successfully developed and built

Poland

Zalesie Wind Farm is located in Mazury Village Warmian-Masurian Voivodeship, in northern Poland.

Building permit and Grid connection for 24.85 MW granted in 2018.

Wind speeds of over 6.65 m/s at 101 m.

High-voltage electric substation 110/30 kV is constructed, and 110 kV power transmission cables are laid.

All seven wind turbines were installed in March 2023.

In September 2023, Zalesie Wind Farm, with a capacity of almost 25 MW, was purchased upon receiving a generation license.

Key data:

  • Manufacturer: Siemens Gamesa
  • Number of turbines: 7
  • Turbine type: SG132 - 3.55 MW
  • Rotor diameter: 132 m
  • Total power of the park: 25 MW
  • Commissioning of the park: August 2023